Project Summary
In 2025, the City of Vancouver engaged SES Consulting to undertake a study to understand the on-site barriers associated with replacing gas-fired equipment with high-efficiency electric equipment. The outcomes of the study were intended to inform the development of equipment efficiency regulations; considerations with respect to exemptions; and building owner support, incentive, and rebate programs to facilitate electrification.
SES and its partners developed low-carbon retrofit designs for a representative set of 18 commercial buildings located in the lower mainland. Replacement equipment was selected and sized based on the existing electrical service, packaged solutions were prioritized where feasible, heat pump technologies were used where possible, and heat recovery was included when applicable.
A multidisciplinary engineering team consisting of SES, AES (Electrical) and RDH (Structural) then used existing information supplemented by site visits to assess the feasibility of each retrofit and estimates project costs, along with financial and energy performance. (Image courtesy of Bill Badzo)
Project Outcomes
The analysis was summarized in a report to the City, along with technical considerations and program recommendations. Findings were presented to key stakeholders, including building owners and experts on the City’s technical advisory committee, to socialize ideas and validate outcomes.
Challenges and Key Learnings
- Translating technical analysis of conceptual designs for retrofitting existing buildings into generalized findings and recommendations requires significant expertise and effective communication across disciplines and between stakeholders. In response to the City’s Request for Proposals and Scope of Work, SES Consulting gathered a diverse and capable team, and proposed our own methodology which achieved the study’s objectives within the available budget.
- A phased approach to building electrification – estimating a building’s spare electrical capacity; identifying electrification measures that can be implemented without exceeding that capacity; implementing those projects, along with real-time metering to monitor the building’s post-retrofit electrical capacity; and then repeating the process for a second round of measures using load management systems – offers the best strategy for maximizing electrification opportunities while minimizing the likelihood of triggering a service upgrade.
- Most commercial buildings do not have existing building-electrical service capacity to support full electrification, and upgrading services can add considerable time, expense, and complexity to a project. Hybrid dual-fuel heat pump/gas-fired equipment and systems can offer a cost-effective pathway to significantly reduce GHG emissions without triggering service upgrades. Right sized and with appropriate controls, these systems can reduce building emissions by 80-90%.