Case Study: Coquitlam Centre Mall

Coquitlam Centre Mall

Heat Recovery Chiller Case Study

Project Summary


Coquitlam Centre is a shopping mall owned by Morguard property management located in the City of Coquitlam that houses 200 stores, a food court, and administrative offices. Constructed in 1979, the north section of the mall was expanded 17 years ago and new chillers, gas boilers, and controls were installed. The two-level shopping centre stretches over 1 million sq ft and an average of 34,000 people visit the mall each day. In the mall, heating is only supplied to the common areas, such as the corridors and hallways; shops are heated by their lights and residual heat from the common areas. Exterior shops that don’t benefit from the building’s residual heat have their own rooftop gas heaters that tenants control and pay for themselves. A hot water loop runs through seven rooftop air handling units (AHUs) which also supply cooling to the common areas.

In 2014, given the facility’s substantial cooling load, Morguard’s property management team was looking to save energy costs and improve operations. Because of the heat produced by lighting and occupant load in the shops, the facility requires both year-round space cooling and heating for ventilation systems. The contractor and consultant worked together to propose a heat recovery chiller (HRC) which would reject waste energy into the facility’s existing water heating systems instead of its cooling towers.

The mall’s original plant had a constant volume hot water tank fed by two 6 million BTU gas boilers. This hot water was supplied at 40°C (104°F) and 60°C (140°F) to the two heating systems which operate in the old and new sections of the mall, respectively. Since the old mall runs at 40°C, it previously ran on a heat exchanger to keep the temperatures lower. The new HRC project re-piped the heating supply system to run in series: water heater 60°C goes to the loads of the new mall first, and cooler return water is then mixed as needed and supplied at 40°C to the old mall. 

This piping redesign allowed the existing heat exchanger to be removed. All distribution pumps were switched from constant flow to variable flow to pump only the water which is needed. The HRC intercepts the return water from the mall and reheats it before it enters the boiler. Post-retrofit, the entire mall can be heated solely by the heat recovery chiller down to 2°C outside temperature, after which the boilers turn on to top-up the heat in the system. The scope of the project also included replacing leaking AHU coil valves, as well as the addition of speed drives on major heat pumps. 

  • Annual Savings:

  • 70% gas consumption
  • 4% electricity consumption
  • 35% GHG (TONNES C02e)
  • $110,000 operating costs

Project Outcomes

The total project cost was $470,000. An incentive of $237,000 was provided by FortisBC, which put the total project cost to the owner at $232,700 with a project payback of 2.1 years. The project had the following outcomes: 

  • 70% reduction in annual gas consumption 
  • 4% reduction in annual electricity consumption
  • 35% decrease in annual GHG emissions
  • $110,000 decrease in annual operating costs 

The project team attributed the success of the project to careful consideration of the design of the new system and ensuring that the right parties were involved from the beginning of the project.

Despite the Trane RTWD chiller’s relatively small size, the biggest obstacle was finding space for the new equipment as well as for the necessary re-piping. This was overcome by relocating the existing air compressor system to a different part of the room, removing the air separator that was not needed, as well as reusing existing piping from the old heat exchanger system to make room for the new chiller. Success came from carefully considering the design of the new system and ensuring the right parties were involved from the beginning. The HRC’s single-and dual-point power electrical connection options allowed reuse of existing electrical wiring. In February 2016 the new system was installed. The HRC was lifted over the food court and into the door of the mechanical room. There were no disruptions to the center’s operation.  The system was commissioned for a full year after installation to ensure correct operation. 

The cascade configuration of the HRC, piping the evaporator into the chiller plant’s condenser water supply line, worked well for this project to capture waste heat, use it in the building and reduce cooling tower water consumption. The schematic design and modeling were critical to prove the benefits of a cascade configuration of the HRC over a parallel configuration. Since the existing chillers were already so efficient with their speed drives, and neither were end of life, it made sense to add this new HRC and recover heat off the condenser water from the existing chillers. This staged configuration allows the HRC to operate at a much higher COP, producing hotter heating water, and use simplified controls.  

The final key learning for this project was the value of doing a thorough and detailed review of the existing system’s controls before initiating a mechanical retrofit project. In this case, the controls review revealed that the AHU coil heating valves were leaking significantly, which was creating a false load on the chiller plant. In this case, the review of the controls revealed that the AHU coil heating valves were leaking, which was creating a false cooling load on the chiller plant. Resolving this prior to system design ensured the equipment was right sized for the actual building loads. 

Testimonials

Lululemon

“SES consulting has been an exceptional consultant for our energy-efficiency studies. They bring deep mechanical engineering expertise, practical insight, and consistently deliver with high level of professionalism. We’ve been very happy with their work and would recommend them without hesitation.”

Rajaa Badaoui, Energy & Sustainability Program Manager
Lululemon

KingSett Capital

“There are very few engineering consulting firms we would trust to implement a full decarbonization strategy and deep energy retrofit, and SES is one of them.”

Kit Milnes, Vice President, Sustainability & Resilience
KingSett Capital

SD68 Nanaimo Ladysmith

“SES Consulting is an extraordinary firm to work with. They are very responsive to the client’s needs and coordinate with all parties throughout the process. I have had the pleasure working with SES on mechanical upgrades, decarbonization and optimization projects.

Their commitment to reducing the carbon footprint shines through in the organization and therefore, provides the best sustainable application for the client.
SES is an organization that delivers high quality engineering services with a staff that are always professional, organized, and helpful.”

Mary Zuccaro, Energy Manager
SD68 Nanaimo Ladysmith

Science World

“Science World hired SES to envision a Deep Energy Retrofit of our facility and support our funding application to the Federal Green and Inclusive Community Buildings (GICB) Program.
Scott Sinclair and his team acted as the Prime Consultant to pull together Architectural, Structural, Mechanical, Electrical, Solar PV, Building Envelope, Acoustic and Code Consulting professionals to virtually eliminate our GHG footprint as well as reducing our Net Energy by 45%.”

Hugh Swan, Director of Infrastructure and Facilities
Science World

Jawl

“We have worked with SES Consulting since 2007. SES has helped us with energy audits, continuous optimization studies, equipment selection, trouble shooting and consulting for design-build mechanical plant upgrades throughout our portfolio of office buildings.

Beyond their high level of technical expertise, the SES team have brought wisdom and a sense of partnership in helping us achieve our sustainability goals. They have been critical to us being on track to achieve our goal of reducing GHG emissions by 60% and our energy consumption by 50% by 2030.”

Karen Jawl, Director
Jawl Properties Ltd.

CEIT

“SES has proven through the years to be an excellent partner of CIET.

Their willingness to innovate on numerous projects of training development and delivery, in accordance with adult learning principles, demonstrates their commitment to contribute to a successful transition towards a low-carbon economy.

Their human-centric and problem-solving approach combined with their ability to always respect deadlines make them a partner of choice’’.

Alexandre Blanchette, Training Program Manager
CIET