Project Summary


 

Since 2014, SES Consulting has led the design and implementation of BMS upgrades for over 30 Telus Central Office sites across BC, Alberta, Manitoba and Ontario, as part of Telus’ program to update their critical infrastructure.   

The scope of these projects includes engineering, oversight of installation work, as well as testing and commissioning of a new Building Management System (BMS) in each facility. For each project, the new BMS is designed to capture all existing alarm points, monitoring and control, and reporting functions. Additionally, AC Power, HVAC points and alarms and other miscellaneous additions are also captured. New sequences of operation were designed to incorporate best practices in energy efficiency while balancing Telus’ unique operational requirements, including principles in accordance with ASHRAE Guideline 36, where applicable.  Present and future requirements were considered to help to reduce the impact on future build requirements and cost of managing the infrastructure network. 

This work directly informed and assisted with the creation of a Telus BMS Standard which sets the minimum requirements for BMS systems across all Telus facilities.   

 

 

 

 

 

A summary of scope of work for these upgrade projects is provided below:  

  • Integration of all HVAC units to the BMS for status and control
  • Tie in of all in-scope IP enabled devices (e.g. BMS controllers, meters etc.)
  • Installation of inverters
  • Tie in of all new BMS controllers to protected inverted power
  • Tie in of the entire BMS to an existing head-end VM server running the BMS software
  • Tie in, enablement, and verification of selected dry contact alarms to the alarm collection devices
  • Configuration, enablement, and verification of email alarms to TELUS
  • Utilize the Good Automated Manufacturing Practices (GAMP) methodology for Installation and Operational Qualification consistent with TELUS Standards for such work
  • Enhanced commissioning process including full performance and failsafe testing   

 

Challenges and Key Learnings

These control systems operate cooling for critical telecommunications infrastructure and must therefore be designed to the highest quality. This extensive experience has allowed SES to further enhance the quality of our BMS upgrade projects, and develop effective and modern templates for this scope of work.

Testimonials

Lululemon

“SES consulting has been an exceptional consultant for our energy-efficiency studies. They bring deep mechanical engineering expertise, practical insight, and consistently deliver with high level of professionalism. We’ve been very happy with their work and would recommend them without hesitation.”

Rajaa Badaoui, Energy & Sustainability Program Manager
Lululemon

KingSett Capital

“There are very few engineering consulting firms we would trust to implement a full decarbonization strategy and deep energy retrofit, and SES is one of them.”

Kit Milnes, Vice President, Sustainability & Resilience
KingSett Capital

SD68 Nanaimo Ladysmith

“SES Consulting is an extraordinary firm to work with. They are very responsive to the client’s needs and coordinate with all parties throughout the process. I have had the pleasure working with SES on mechanical upgrades, decarbonization and optimization projects.

Their commitment to reducing the carbon footprint shines through in the organization and therefore, provides the best sustainable application for the client.
SES is an organization that delivers high quality engineering services with a staff that are always professional, organized, and helpful.”

Mary Zuccaro, Energy Manager
SD68 Nanaimo Ladysmith

Science World

“Science World hired SES to envision a Deep Energy Retrofit of our facility and support our funding application to the Federal Green and Inclusive Community Buildings (GICB) Program.
Scott Sinclair and his team acted as the Prime Consultant to pull together Architectural, Structural, Mechanical, Electrical, Solar PV, Building Envelope, Acoustic and Code Consulting professionals to virtually eliminate our GHG footprint as well as reducing our Net Energy by 45%.”

Hugh Swan, Director of Infrastructure and Facilities
Science World

Jawl

“We have worked with SES Consulting since 2007. SES has helped us with energy audits, continuous optimization studies, equipment selection, trouble shooting and consulting for design-build mechanical plant upgrades throughout our portfolio of office buildings.

Beyond their high level of technical expertise, the SES team have brought wisdom and a sense of partnership in helping us achieve our sustainability goals. They have been critical to us being on track to achieve our goal of reducing GHG emissions by 60% and our energy consumption by 50% by 2030.”

Karen Jawl, Director
Jawl Properties Ltd.

CEIT

“SES has proven through the years to be an excellent partner of CIET.

Their willingness to innovate on numerous projects of training development and delivery, in accordance with adult learning principles, demonstrates their commitment to contribute to a successful transition towards a low-carbon economy.

Their human-centric and problem-solving approach combined with their ability to always respect deadlines make them a partner of choice’’.

Alexandre Blanchette, Training Program Manager
CIET