Case Study: Telus Central Office BMS Upgrades
Telus Central Office BMS Upgrades
Building Management System Design Case Study

Project Summary
Since 2014, SES Consulting has led the design and implementation of BMS upgrades for over 30 Telus Central Office sites across BC, Alberta, Manitoba and Ontario, as part of Telus’ program to update their critical infrastructure.
The scope of these projects includes engineering, oversight of installation work, as well as testing and commissioning of a new Building Management System (BMS) in each facility. For each project, the new BMS is designed to capture all existing alarm points, monitoring and control, and reporting functions. Additionally, AC Power, HVAC points and alarms and other miscellaneous additions are also captured. New sequences of operation were designed to incorporate best practices in energy efficiency while balancing Telus’ unique operational requirements, including principles in accordance with ASHRAE Guideline 36, where applicable. Present and future requirements were considered to help to reduce the impact on future build requirements and cost of managing the infrastructure network.
This work directly informed and assisted with the creation of a Telus BMS Standard which sets the minimum requirements for BMS systems across all Telus facilities.
A summary of scope of work for these upgrade projects is provided below:
- Integration of all HVAC units to the BMS for status and control
- Tie in of all in-scope IP enabled devices (e.g. BMS controllers, meters etc.)
- Installation of inverters
- Tie in of all new BMS controllers to protected inverted power
- Tie in of the entire BMS to an existing head-end VM server running the BMS software
- Tie in, enablement, and verification of selected dry contact alarms to the alarm collection devices
- Configuration, enablement, and verification of email alarms to TELUS
- Utilize the Good Automated Manufacturing Practices (GAMP) methodology for Installation and Operational Qualification consistent with TELUS Standards for such work
- Enhanced commissioning process including full performance and failsafe testing
Challenges and Key Learnings
These control systems operate cooling for critical telecommunications infrastructure and must therefore be designed to the highest quality. This extensive experience has allowed SES to further enhance the quality of our BMS upgrade projects, and develop effective and modern templates for this scope of work.